The following Environmental Stewardship Summary Report (ESSR) was prepared for Tactical Infrastructure (TI) constructed within the Del Rio U.S. Border Patrol Sector. The Del Rio PF225 ESSR was prepared to establish a final new baseline for future maintenance and repair and any potential future action, to document the success of Best Management Practices (BMPs), and to document any changes to the planned location or type of the tactical infrastructure constructed.
For more information or to receive a copy of any previous CBP Environmental Document not found on this Web site, please contact the CBP Environmental Program at CBPEnvironmentalProgram@cbp.dhs.gov.
Attachment | Ext. | Size | Date |
---|---|---|---|
Del Rio PF225 ESSR | 3.44 MB | 01/29/2014 |